Dynon Road Bridge widening

Dynon Road Bridge widening

Australia, EIC Activities 

EIC Activities’ structures, construction engineering and temporary works team was engaged by CPB Contractors to provide a solution for the Dynon Road Bridge widening, as part of the West Gate Tunnel project in Victoria.

With 15 railway lines running underneath the bridge, many of the required crane lifts of up to 200T, could only be performed from the bridge deck. The EIC Activities team assessed the bridge structure, determined the appropriate crane positions and associated temporary works required, and enabled the team to safely widen the bridge structure on time.

Sydney Metro – Western Sydney Airport

Sydney Metro – Western Sydney Airport

New South Wales, CPB Contractors, EIC Activities, Leighton Asia's One Digital Construction Services 

CPB Contractors, EIC Activities and Leighton Asia’s One Digital Construction Services (1DCS) unit collaborated on the successful design of the temporary works supporting the tunnel boring machine (TBM) and back-up gantries for the Sydney Metro – Western Sydney Airport, Station Boxes and Tunnelling Works (WSA-SBT).

The CPB Contractors project team engaged EIC Activities to lead the delivery of the design works, in collaboration with 1DCS. EIC Activities and 1DCS utilised CPB Contractors’ common data environment which enables collaboration between project stakeholders with BIM360 and Projectwise. The team’s designs were integrated with designs from other design delivery partners, and achieved seamless integration with the TBM, ultimately minimising delays and mitigating potential issues during construction.

Major civil projects

Major civil projects

Philippines, Leighton Asia

Leighton Asia leveraged the expertise and capabilities of EIC Activities to secure two major civil projects in the Philippines – the Candaba 3rd Viaduct and South Commuter Railway projects.

EIC Activities is now embarking on detailed services for both projects. The Candaba Viaduct project includes the delivery of an independent 5.3 kilometre bridge.

The South Commuter Railway Project, being delivered in joint venture, includes engineering, tunnel and building works for approximately 6.1 kilometres of the railway, construction of the FTI Station, tunnelling works to connect to the Metro Manila Subway Project Senate Station, and other works.